[1]
“Line Stop Time Reduction through Dandori Evaluation in Plastic Injection Process Production”, ASIIMETRIK, vol. 6, no. 2, pp. 319–326, Jul. 2024, doi: 10.35814/asiimetrik.v6i2.6624.