(1)
COST PLAN ANALYSIS UPPER STRUCTURE WORKS: (Case Study of Urban Homes Residential Tower B North Lippo VillageProject, Tangerang). infrastruktur 2021, 7 (2), 131-138. https://doi.org/10.35814/infrastruktur.v7i2.2731.