(1)
SUPPLY CHAIN ANALYSIS TO REDUCE DELAYS ON GREEN BUILDING PROJECTS WITH ANALYTICAL HIERARCHY PROCESS METHOD. infrastruktur 2022, 8 (2), 71-78. https://doi.org/10.35814/infrastruktur.v8i2.3287.