(1)
COMPARISON OF COST AND TIME OF FLOOR SLAB WORKS ON CONVENTIONAL AND BUBBLE DECK SLAB METHODS: Case Study of Central Control Building, Muara Tawar Power Plant Project, Bekasi, West Java. infrastruktur 2022, 8 (2), 117-125. https://doi.org/10.35814/infrastruktur.v8i2.4031.