1.
COST PLAN ANALYSIS UPPER STRUCTURE WORKS: (Case Study of Urban Homes Residential Tower B North Lippo VillageProject, Tangerang). infrastruktur. 2021;7(2):131-138. doi:10.35814/infrastruktur.v7i2.2731