1.
SUPPLY CHAIN ANALYSIS TO REDUCE DELAYS ON GREEN BUILDING PROJECTS WITH ANALYTICAL HIERARCHY PROCESS METHOD. infrastruktur. 2022;8(2):71-78. doi:10.35814/infrastruktur.v8i2.3287