1.
ANALYSIS OF THE MOTIVATION LEVEL OF CONSTRUCTION PROJECT WORKERS DURING THE COVID-19 PANDEMIC BASED ON MASLOW’S THEORY USING THE BAYESIAN BELIEF NETWORK METHOD. infrastruktur. 2022;8(2):91-98. doi:10.35814/infrastruktur.v8i2.3752