1.
COMPARISON OF COST AND TIME OF FLOOR SLAB WORKS ON CONVENTIONAL AND BUBBLE DECK SLAB METHODS: Case Study of Central Control Building, Muara Tawar Power Plant Project, Bekasi, West Java. infrastruktur. 2022;8(2):117-125. doi:10.35814/infrastruktur.v8i2.4031