COST PLAN ANALYSIS UPPER STRUCTURE WORKS: (Case Study of Urban Homes Residential Tower B North Lippo VillageProject, Tangerang). (2021). Jurnal Infrastruktur , 7(2), 131-138. https://doi.org/10.35814/infrastruktur.v7i2.2731