THE IMPLEMENTATION OF WORK BREAKDOWN STRUCTURE IN PREVENTIVE MAINTENANCE OF TOTAL FIRE SYSTEM (PMTFS) TO IMPROVE BUILDING RELIABILITY. (2025). Jurnal Infrastruktur , 11(1), 27-33. https://doi.org/10.35814/tx362670