ANALYSIS OF THE MOTIVATION LEVEL OF CONSTRUCTION PROJECT WORKERS DURING THE COVID-19 PANDEMIC BASED ON MASLOW’S THEORY USING THE BAYESIAN BELIEF NETWORK METHOD. Jurnal Infrastruktur , [S. l.], v. 8, n. 2, p. 91–98, 2022. DOI: 10.35814/infrastruktur.v8i2.3752. Disponível em: https://journal.univpancasila.ac.id/index.php/infrastruktur/article/view/3752. Acesso em: 1 oct. 2026.