“COST PLAN ANALYSIS UPPER STRUCTURE WORKS: (Case Study of Urban Homes Residential Tower B North Lippo VillageProject, Tangerang)”. 2021. Jurnal Infrastruktur 7 (2): 131-38. https://doi.org/10.35814/infrastruktur.v7i2.2731.