“ANALYSIS OF THE MOTIVATION LEVEL OF CONSTRUCTION PROJECT WORKERS DURING THE COVID-19 PANDEMIC BASED ON MASLOW’S THEORY USING THE BAYESIAN BELIEF NETWORK METHOD”. 2022. Jurnal Infrastruktur 8 (2): 91-98. https://doi.org/10.35814/infrastruktur.v8i2.3752.