“COMPARISON OF COST AND TIME OF FLOOR SLAB WORKS ON CONVENTIONAL AND BUBBLE DECK SLAB METHODS: Case Study of Central Control Building, Muara Tawar Power Plant Project, Bekasi, West Java”. 2022. Jurnal Infrastruktur 8 (2): 117-25. https://doi.org/10.35814/infrastruktur.v8i2.4031.