Fitri Nur Kharina, and Kusno Adi Sambowo. 2019. “ANALISIS KETERLAMBATAN PROYEK SERTA DAMPAKNYA TERHADAP BIAYA DAN WAKTU PELAKSANAAN PROYEK”. Jurnal Infrastruktur 5 (1), 13 - 19. https://doi.org/10.35814/infrastruktur.v5i1.614.