Syamsuddin, Joryans, Niken Warastuti, and Resti Nur Arini. 2019. “ANALISIS PERBANDINGAN PELAT LANTAI KONVENSIONAL DAN PRACETAK DITINJAU DARI ASPEK BIAYA DAN WAKTU PADA DERMAGA 006 TERMINAL OPERASI 1 PELABUHAN TANJUNG PRIOK, JAKARTA UTARA ”. Jurnal Infrastruktur 4 (2), 127 -34. https://doi.org/10.35814/infrastruktur.v4i2.702.