“COST PLAN ANALYSIS UPPER STRUCTURE WORKS: (Case Study of Urban Homes Residential Tower B North Lippo VillageProject, Tangerang)” (2021) Jurnal Infrastruktur, 7(2), pp. 131–138. doi:10.35814/infrastruktur.v7i2.2731.