“ANALYSIS OF THE MOTIVATION LEVEL OF CONSTRUCTION PROJECT WORKERS DURING THE COVID-19 PANDEMIC BASED ON MASLOW’S THEORY USING THE BAYESIAN BELIEF NETWORK METHOD” (2022) Jurnal Infrastruktur, 8(2), pp. 91–98. doi:10.35814/infrastruktur.v8i2.3752.