Lukmana, W. D. and Herzanita, A. (2021) “COST PLAN ANALYSIS UPPER STRUCTURE WORKS”, Jurnal Infrastruktur , 7(2), pp. 131 - 138. doi: 10.35814/infrastruktur.v7i2.2731.