Fitri Nur Kharina and Kusno Adi Sambowo (2019) “ANALISIS KETERLAMBATAN PROYEK SERTA DAMPAKNYA TERHADAP BIAYA DAN WAKTU PELAKSANAAN PROYEK”, Jurnal Infrastruktur , 5(1), pp. 13 - 19. doi: 10.35814/infrastruktur.v5i1.614.