[1]
“COST PLAN ANALYSIS UPPER STRUCTURE WORKS: (Case Study of Urban Homes Residential Tower B North Lippo VillageProject, Tangerang)”, infrastruktur, vol. 7, no. 2, pp. 131–138, Oct. 2021, doi: 10.35814/infrastruktur.v7i2.2731.