[1]
“ANALYSIS OF THE MOTIVATION LEVEL OF CONSTRUCTION PROJECT WORKERS DURING THE COVID-19 PANDEMIC BASED ON MASLOW’S THEORY USING THE BAYESIAN BELIEF NETWORK METHOD”, infrastruktur, vol. 8, no. 2, pp. 91–98, Oct. 2022, doi: 10.35814/infrastruktur.v8i2.3752.