[1]
“COMPARISON OF COST AND TIME OF FLOOR SLAB WORKS ON CONVENTIONAL AND BUBBLE DECK SLAB METHODS: Case Study of Central Control Building, Muara Tawar Power Plant Project, Bekasi, West Java”, infrastruktur, vol. 8, no. 2, pp. 117–125, Oct. 2022, doi: 10.35814/infrastruktur.v8i2.4031.