“ANALYSIS OF THE MOTIVATION LEVEL OF CONSTRUCTION PROJECT WORKERS DURING THE COVID-19 PANDEMIC BASED ON MASLOW’S THEORY USING THE BAYESIAN BELIEF NETWORK METHOD”. Jurnal Infrastruktur , vol. 8, no. 2, Oct. 2022, pp. 91-98, https://doi.org/10.35814/infrastruktur.v8i2.3752.