“COMPARISON OF COST AND TIME OF FLOOR SLAB WORKS ON CONVENTIONAL AND BUBBLE DECK SLAB METHODS: Case Study of Central Control Building, Muara Tawar Power Plant Project, Bekasi, West Java”. Jurnal Infrastruktur 8, no. 2 (October 28, 2022): 117–125. Accessed June 30, 2025. https://journal.univpancasila.ac.id/index.php/infrastruktur/article/view/4031.