1.
ANALYSIS OF THE MOTIVATION LEVEL OF CONSTRUCTION PROJECT WORKERS DURING THE COVID-19 PANDEMIC BASED ON MASLOW’S THEORY USING THE BAYESIAN BELIEF NETWORK METHOD. infrastruktur [Internet]. 2022 Oct. 28 [cited 2026 Oct. 1];8(2):91-8. Available from: https://journal.univpancasila.ac.id/index.php/infrastruktur/article/view/3752