1.
Mirnayani, Kholida L. ANALYSIS OF THE MOTIVATION LEVEL OF CONSTRUCTION PROJECT WORKERS DURING THE COVID-19 PANDEMIC BASED ON MASLOW’S THEORY USING THE BAYESIAN BELIEF NETWORK METHOD. infrastruktur [Internet]. 2022Oct.28 [cited 2024Apr.26];8(2):91-8. Available from: https://journal.univpancasila.ac.id/index.php/infrastruktur/article/view/3752