1.
Kurnia RM, Andreas A, Tinumbia N. COMPARISON OF COST AND TIME OF FLOOR SLAB WORKS ON CONVENTIONAL AND BUBBLE DECK SLAB METHODS. infrastruktur [Internet]. 2022Oct.28 [cited 2024Apr.26];8(2):117-25. Available from: https://journal.univpancasila.ac.id/index.php/infrastruktur/article/view/4031