[1]
2026. Optimization of Production Scheduling on the Nct Vipross 255 Machine Using the Heuristic Priority Dispatching Rules Method and Overall Equipment Effectiveness. Teknobiz : Jurnal Ilmiah Program Studi Magister Teknik Mesin. 16, 1 (Mar. 2026), 29–37. DOI:https://doi.org/10.35814/mszjbf44.