(1)
IMPLEMENTASI METODE FMEA & FTA UNTUK MEMPREDIKSI DELIVERY TIMEPROJECT EPC – STUDI KASUS KONSTRUKSI FABRIKASI POWER GENERATION MODULES 2X62MW FPSO X PROJECT PT. X DI BATAM. teknobiz 2017, 7 (3), 129-136. https://doi.org/10.35814/teknobiz.v7i3.909.