(1)
Optimization of Production Scheduling on the Nct Vipross 255 Machine Using the Heuristic Priority Dispatching Rules Method and Overall Equipment Effectiveness. teknobiz 2026, 16 (1), 29-37. https://doi.org/10.35814/mszjbf44.