“Optimization of Production Scheduling on the Nct Vipross 255 Machine Using the Heuristic Priority Dispatching Rules Method and Overall Equipment Effectiveness” (2026) Teknobiz : Jurnal Ilmiah Program Studi Magister Teknik Mesin, 16(1), pp. 29–37. doi:10.35814/mszjbf44.