[1]
“Optimization of Production Scheduling on the Nct Vipross 255 Machine Using the Heuristic Priority Dispatching Rules Method and Overall Equipment Effectiveness”, teknobiz, vol. 16, no. 1, pp. 29–37, Mar. 2026, doi: 10.35814/mszjbf44.