COST PLANNING BANGUNAN GEDUNG SEDERHANA DENGAN COST SIGNIFICANT MODEL DI KABUPATEN HULU SUNGAI SELATAN (Studi Kasus Proyek PKM di Hulu Sungai Selatan)

  • Candra Yuliana Program Studi Teknik Sipil Fakultas Teknik Universitas Lambung Mangkurat
  • Aulia Isramaulana Program Studi Teknik Sipil Fakultas Teknik Universitas Lambung Mangkurat
  • M. Dzulfi Khairiannoor Program Studi Teknik Sipil Fakultas Teknik Universitas Lambung Mangkurat
DOI: https://doi.org/10.35814/infrastruktur.v7i1.1290
Abstract views: 297 | pdf downloads: 323

Abstract

Project cost estimates must be prepared before the project is implemented. The Cost Significant Model is a model of estimating total construction costs, based on past construction data using the Pareto Principle. The purpose of this research is to apply the method of cost significant models to a building project to determine the initial cost of a building project. The estimated cost per m2 model is Y = 11,564 (X3) + 2949750.72, where X3 is the cost per m2 of foundation, sloof, and floor work. The accuracy of the Cost Significant Model ranges from -9.4% to 4.8%. This estimation model is feasible to be used to check the estimated offer.

References

Atmaja, J., Elvi Roza Sofyan, Anne Fadillah. (2018). Perbandingan Cost Significant Model dengan Metode Parametrik Untuk Estimasi Biaya Gedung Bertingkat 2. Jurnal Ilmiah Poli Rekayasa. Politeknik Padang, vol. 14 No. 1, hal. 43. Padang.

Astana, I Nyoman Yudha. (2017). Estimasi Biaya Konstruksi Gedung Dengan Cost Significant Model. Jurnal Riset Rekayasa Sipil Universitas Sebelas Maret. vol.1 No. 1, hal. 7-15.

Budiputra, Andreas Setiawan. (2011). Cost Estimation With Cost Significant Model Especially for Office Building Project. Skripsi. Teknik Sipil Universitas Atma Jaya. Yogyakarta

Christensen, Peter dan Dysert, Larry R. (2005). AACE International Recommended Practice No. 18R-97 Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries (TCM Framework: 7.3 – Cost Estimating and Budgeting). AACE, Inc

Dipohusodo, Istimawan. (1996). Manajemen Proyek dan Konstruksi, Jilid 2. Yogyakarta: Kanisius.

Poh, P. S., dan Horner, R. M. (1995). Cost‐Significant Modelling ‐ Its Potential for Use in South‐East Asia. Paper in Engineering, Construction and Architectural Management. 121-139.

Indrawan, Gede Sony. (2011). Estimasi Biaya Pemeliharaan Jalan dengan Cost Significant Model Studi Kasus Pemeliharaan Jalan Kabupaten di Kabupaten Jembrana. Tesis. Universitas Udayana.

Raharjo, Sahid. (2014). Uji Multikolinieritas dengan Melihat Nilai Tolerance dan VIF SPSS. Diakses dari https://www.spssindonesia.com/2014/02/uji-multikolonieritas-dengan-melihat.html [17 Januari 2020]

Soeharto, Imam. (1995). Manajemen Proyek dari Konseptual sampai Operasional. Jakarta: Erlangga.

Yuliana, Candra. (2018). Ekonomi Rekayasa Edisi 2, Baku Ajar. Lambung Mangkurat University Press. Banjarmasin.

Published
2021-04-26
How to Cite
Yuliana, C., Isramaulana, A., & Khairiannoor, M. D. (2021). COST PLANNING BANGUNAN GEDUNG SEDERHANA DENGAN COST SIGNIFICANT MODEL DI KABUPATEN HULU SUNGAI SELATAN (Studi Kasus Proyek PKM di Hulu Sungai Selatan). Jurnal Infrastruktur , 7(1), 1 - 6. https://doi.org/10.35814/infrastruktur.v7i1.1290