SUPPLY CHAIN ANALYSIS TO REDUCE DELAYS ON GREEN BUILDING PROJECTS WITH ANALYTICAL HIERARCHY PROCESS METHOD

  • Rossy Armyn Machfudiyanto
  • Ammar Syahreza Universitas Indonesia
DOI: https://doi.org/10.35814/infrastruktur.v8i2.3287
Abstract views: 276 | pdf downloads: 556
Keywords: Green Building, Supply Chain, Schedule Delay

Abstract

In developing countries such as Indonesia with high population growth, the need for development is also increasing. However construction is responsible for adverse impacts on the environment ranging from extraction, processing and transportation of raw materials, construction, and operation of building facilities. The building sector is also the largest contributor to energy use (about 40%). Based on this, innovations emerged in the form of Green Buildings to reduce the negative impact on the environment. However, in the implementation of green buildings, obstacles are often found in the form of schedule delays, one of which is caused by activities in the supply chain. This study uses the Analytical Hierarchy Process (AHP) method to identify and analyze activities in the supply chain. It was found that the strategy in reducing delays in green building is supply chain that focuses on efficiency.

References

Arsyad, K.M. 2017. “Modul Pengenalan Manajemen Rantai Pasok Pelatihan Manajemen Rantai Pasok Konstruksi.”
Artha, Bhenu, Nurina Vidya Ayuning Tyas, and Desy Ayu Krisna Murti. 2020. “Analisa Kajian Literatur Green Building Berdasarkan Sudut Pandang Perkembangan Ekonomi.” Jurnal Arsitektur Pendapa 3 (2): 47–52. https://doi.org/10.37631/pendapa.v3i2.166.
Balai Diklat PUPR Wilayah V Yogyakarta. 2019. “Tahap Pelaksanaan Bangunan Gedung Hijau.”
Boeren, Ellen, and Nalita James. 2018. “Conclusions and Recommendations.” Being an Adult Learner in Austere Times: Exploring the Contexts of Higher, Further and Community Education, 199–210. https://doi.org/10.1007/978-3-319-97208-4_9.
Bon-Gang, Hwang. 2018. “Schedule Performance and Improvement of Green Construction Projects.” Performance and Improvement of Green Construction Projects, no. 1: 119–48. https://doi.org/10.1016/b978-0-12-815483-0.00009-0.
Chan, Shiau Wei, S. T.Suman Tiwari, M. F. Ahmad, Izzuddin Zaman, and Wan Ling Sia. 2018. “Green Procurement Practices and Barriers in Furniture Manufacturing Companies.” International Journal of Supply Chain Management 7 (6): 431–38.
Dalkey, Norman, and Olaf Helmer. 1962. “AN EXPERIMENTAL APPLICATION OF THE DELPHI METHOD TO THE USE OF EXPERTS.”
Fadlillah, Beny. 2011. “UPAYA MEMINIMASI BULLWHIP EFFECT PADA SUPPLY CHAIN DENGAN PERBAIKAN SISTEM PEMESANAN GUNA MENDAPATKAN BIAYA PEMESANAN YANG OPTIMAL (Studi Kasus Di CV. Rahmat, Blora).” 中国工业经济, 138–55.
Fenner, Andriel Evandro, and Charles Joseph Kibert. 2017. “Sustainable Manufacturing : Design and Construction Strategies,” no. August.
Ghazilla, Raja Ariffin Raja, Novita Sakundarini, Salwa Hanim Abdul-Rashid, Nor Syakirah Ayub, Ezutah Udoncy Olugu, and S. Nurmaya Musa. 2015. “Drivers and Barriers Analysis for Green Manufacturing Practices in Malaysian Smes: A Preliminary Findings.” Procedia CIRP 26: 658–63. https://doi.org/10.1016/j.procir.2015.02.085.
Hardiani, Novilia, and Tri Joko Wahyu Adi. 2017. “Factors Affecting the Implementation of Green Procurement in Indonesia Construction Industry.” IPTEK Journal of Proceedings Series 0 (2): 50. https://doi.org/10.12962/j23546026.y2017i2.2278.
Husen, Abrar. 2010. “Manajemen Proyek Perencanaan, Penjadwalan & Pengendalian Proyek,” 253.
IABHI. 2019. “GREEN BUILDING in INDONESIA,” no. December.
Jiang, Han, and Sarah Payne. 2019. “Green Housing Transition in the Chinese Housing Market: A Behavioural Analysis of Real Estate Enterprises.” Journal of Cleaner Production 241: 118381. https://doi.org/10.1016/j.jclepro.2019.118381.
KEMENTERIAN PEKERJAAN UMUM. 2013. “KAJIAN RANTAI PASOK MATERIAL DAN PERALATAN KONSTRUKSI DALAM MENDUKUNG INVESTASI DI BIDANG KONSTRUKSI BERLANJUTAN,” no. 20.
Kementerian Pekerjaan Umum dan Perumahan Rakyat. 2015. “Peraturan Menteri Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia No 2/PRT/M/2015 Tentang Bangunan Gedung Hijau.” Pemerintah Republik Indonesia, 2–70. https://pug-pupr.pu.go.id/_uploads/Produk_Pengaturan/Permen PUPR No 02-2015.pdf.
Kementrian PUPR. 2017. “MODUL MANAJEMEN RANTAI PASOK PADA INDUSTRI KONSTRUKSI PELATIHAN,” 95.
Kirunga, Francis, and Allan Kihara. 2018. “Influence of Green Distribution Practices on Environmental Performance of Chemical Manufacturing Firms in Kenya.” Journal of International Business, Innovation and Strategic Management 1 (7): 1–15. http://www.jibism.org/core_files/index.php/JIBISM/article/view/76/75.
Kumar, Ranjit. 2011. RESEARCH METHODOLOGY a Step-by-Step Guide for Beginners.
Kurniawati, Anita Theresia, and Misbahul Munir. 2017. “Analytic Hierarchy Process (AHP) Untuk Penentuan Rangking Penggunaan Lahan.” Journal of Research and Technology 3 (1): 54–62.
Manik, Donald Robert, Reynard Setijadi Lumbantoruan, and Alfian Aziz Nasution. 2019. “Faktor Pendorong Dan Penghambat Penerapan Green Supply Chain Management.” Talenta Conference Series: Energy and Engineering (EE) 2 (4). https://doi.org/10.32734/ee.v2i4.686.
Messah, Y.unita, Theodorus Widodo, and Marisya Adoe. 2013. “Kajian Penyebab Keterlambatan Pelaksanaan.” Universitas Nusa Cendana II (2): 157–68.
Parhusip, Jadiaman. 2019. “Penerapan Metode Analytical Hierarchy Process (AHP) Pada Desain Sistem Pendukung Keputusan Pemilihan Calon Penerima Bantuan Pangan Non Tunai (BPNT) Di Kota Palangka Raya.” Jurnal Teknologi Informasi Jurnal Keilmuan Dan Aplikasi Bidang Teknik Informatika 13 (2): 18–29. https://doi.org/10.47111/jti.v13i2.251.
Pembinaan, Pusat, Sumber Daya, and Kata Pengantar. 2012. “KAJIAN RANTAI PASOK ALAT BERAT KONSTRUKSI DALAM MENDUKUNG INVESTASI INFRASTRUKTUR,” no. 20.
Priyono, Anjar. 2008. “Faktor Pendorong Dan Penghambat Rantai Pasokan Ramah Lingkungan: Literatur Review.”
Puryono, Daniel Alfa, Mustafid Mustafid, and Ferry Jie. 2017. “Penerapan Green Supply Chain Management Untuk Peningkatan Kinerja Keuangan Perusahaan.” Jurnal Sistem Informasi Bisnis 6 (2): 154. https://doi.org/10.21456/vol6iss2pp154-163.
Pusdiklat SDA dan Konstruksi. 2016. “Modul Manajemen Penyelenggaraan Konstruksi,” 1–75.
Qian, Queena K., Edwin H.W. Chan, and Abd Ghani Khalid. 2015. “Challenges in Delivering Green Building Projects: Unearthing the Transaction Costs (TCs).” Sustainability (Switzerland) 7 (4): 3615–36. https://doi.org/10.3390/su7043615.
RA Laksmi Widyawati. 2018. “Green Building Dalam Pembangunan Berkelanjutan Konsep Hemat Energi Menuju Green Building Di Jakarta.” Karya Lintas Ilmu Bidang Rekayasa Arsitektur, Sipil, Industri 13. https://ejournal.borobudur.ac.id/index.php/teknik/article/view/463.
RezaHoseini, Ali, Siamak Noori, and Seyed Farid Ghannadpour. 2021. “Integrated Scheduling of Suppliers and Multi-Project Activities for Green Construction Supply Chains under Uncertainty.” Automation in Construction 122 (January 2020): 103485. https://doi.org/10.1016/j.autcon.2020.103485.
Roscoe, J. T. 1971. “Fundamental Research Statistics for the Behavioral Sciences.” Journal of the American Statistical Association 66 (333): 224. https://doi.org/10.2307/2284880.
Saaty, Thomas L. 1993. “The Analytical Hierarchy Process: Planning, Priority Setting, Resource Allocation,” no. July: 1–23.
Saaty, Thomas L. 2008. “Decision Making with the Analytic Hierarchy Process” 1 (1).
Supardi, Supardi. 1993. “Populasi Dan Sampel Penelitian.” Unisia 13 (17): 100–108. https://doi.org/10.20885/unisia.vol13.iss17.art13.
Teijlingen, Edwin Roland Van. 2018. “The Importance of Pilot Studies, Social Research Update, Vol. 35 No” 35 (January 2001).
Thaha, Putranesia. 2016. PENGEMBANGAN MODEL PENGUKURAN KINERJA RANTAI PASOK PADA INDUSTRI KONSTRUKSI PERUMAHAN.
Wibowo, Mochamad Agung, Naniek Utami Handayani, and Anita Mustikasari. 2018. “Factors for Implementing Green Supply Chain Management in the Construction Industry.” Journal of Industrial Engineering and Management 11 (4): 651–79. https://doi.org/10.3926/jiem.2637.
Wisudanto, Agus Wibowo, and Retno Indryani. 2012. Faktor-Faktor Penyebab Keterlambatan Pada Proyek Konstruksi Gedung Di Kediri. Its.
Xiao, Lei, Li Bie, and Xue Bai. 2021. “Controlling the Schedule Risk in Green Building Projects: Buffer Management Framework with Activity Dependence.” Journal of Cleaner Production 278: 123852. https://doi.org/10.1016/j.jclepro.2020.123852.
Zou, Patrick X.W., and Paul Couani. 2012. “Managing Risks in Green Building Supply Chain.” Architectural Engineering and Design Management 8 (2): 143–58. https://doi.org/10.1080/17452007.2012.659507.
Published
2022-10-28
How to Cite
Rossy Armyn Machfudiyanto, & Syahreza, A. (2022). SUPPLY CHAIN ANALYSIS TO REDUCE DELAYS ON GREEN BUILDING PROJECTS WITH ANALYTICAL HIERARCHY PROCESS METHOD. Jurnal Infrastruktur , 8(2), 71-78. https://doi.org/10.35814/infrastruktur.v8i2.3287