ANALISIS KETERLAMBATAN PROYEK SERTA DAMPAKNYA TERHADAP BIAYA DAN WAKTU PELAKSANAAN PROYEK

  • Fitri Nur Kharina Universitas Pancasila
  • Kusno Adi Sambowo Universitas Negeri Jakarta
DOI: https://doi.org/10.35814/infrastruktur.v5i1.614
Abstract views: 2475 | pdf downloads: 2831
Keywords: Delay Analysis, Project Delay, Earned Value, Cost and Time

Abstract

Construction projects in all regions continues to be developed for the creation of facilities that can be utilized by the community. One of them is the construction of apartments which are now being intensively carried out to meet residential needs for the community. Making a construction project plan always refers to estimates that exist at the time development plan is made, therefore problems can arise if there is a discrepancy between the plans that have been made and the actual reality. So the impact that often occurs is the delay in the time of project implementation which can also be accompanied by an increase in the cost of implementing the project. In the construction project of Cinere Terrace Suites Apartemen & Citywalk, Jakarta there was a delay resulting in a late payment of monthly bill progress by the owner. Based on the above reasons, this research was conducted to find out how the project performance was seen from the cost and time period of the review period. how is the estimated cost and time to complete the overall project work. The method used in the analysis of this study is the Earned Value Method. Based on the results of the analysis carried out for 29 weeks the project performance on schedule has been delayed and cost shows a positive value. For the estimated completion time of the project there is an increase in time whose duration increases from the planned 98 weeks or 685 days to 109,624 weeks or 768 days. While the estimated cost of completing the project from the results of the analysis obtained a value of Rp. 270,147,448,569.16 smaller than the planned cost of Rp. 315,272,727,272.73. With the difference VAC of Rp. 45,125,278,703.57 this shows that there are benefits obtained by the contractor.

References

Andi dkk. (2003). Pengaruh Keterlambatan Proyek terhadap Pembekakan Biaya Proyek. Universitas Kristen Petra. Surabaya

Asiyanto. (2005). Manajemen Produksi Untuk Jasa Konstruksi. Pradnya Paramitha. Jakarta

Bastian, Indra. (2006). Akuntansi Sektor Publik : Suatu Pengantar. Penerbit Erlangga. Jakarta

Budi Suanda. (2016). “Advance & Effective Project Management”

Budi Witjaksana, Samuel Petrik Reresi. (2012). Analisis Biaya Proyek Dengan Metode Earned Value Dalam Proses Kinerja. Extrapolasi Jurnal Teknik Sipil. Universitas 17 Agustustus 1945 Surabaya

Callahan, M. T. (1992). Construction Project Schedulling. Mc Graw Hill. New York

Dhian C. Nur Astina, Ida Ayu Rai Widhiawati, I G. Putu Joni. (2011). Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Pekerjaan Proyek Konstruksi Di Kabupaten Tabanan. Jurnal Ilmiah Elektronik Infrastruktur Teknik Sipil. Universitas Udayana. Denpasar

Ervianto, Wulfram, I. (2004). Teori Aplikasi Manajemen Proyek Konstruksi. Salemba Empat. Yogyakarta

Fauzy Nasution a , Ir. Syahrizal M.T.b. Penerapan Metode Konsep Nilai Hasil (Earned Value Concept) Dalam Pengendalian Proyek. Departemen Teknik Sipil, Fakultas Teknik, Universitas Sumatera Utara

Irika Widiasanti, Lenggogeni. (2013). Manajemen Konstruksi. Remaja Rosdakarya. Bandung

Istimawan Dipihusodo. (1996). Manajemen Proyek dan Konstruksi jilid 1 dan 2. Kanisuius. Yogyakarta

Levis and Atherley. (1996). Delay Construction. Cahner Books Internasional. Langford

Mandiyo Priyo. (2012). Metode Earned Value Pada Jasa Konstruksi. Lembaga Penelitian dan Pengembangan Pendidikan Universitas Muhammadiyah. Yogyakarta

Muhammad Izeul Maromi dan Retno Indryani. (2014). Metode Earned Value untuk Analisa Kinerja Biaya dan Waktu Pelaksanaan pada Proyek Pembangunan Condotel De Vasa Surabaya. Cited in https://media.neliti.com/media/publications/213460-metode-earned-value-untuk-analisa-kinerj.pdf. [10 Januari 2019]

Mulyadi. (2007). Sistem Perencanaan dan Pengendalian Manajemen. Salemba Empat. Jakarta

Sari, Putri Monica. (2014). Analisis Tingkat Efektifitas Penggunaan Metode Nilai Hasil Pada Pengendalian Proyek Konstruksi Di Yogyakarta. S1 thesis, UAJY.

Soeharto, I. (1995). Manajemen Proyek dari Konseptual sampai Operasional. Penerbit Erlangga. Jakarta

Soeharto, I. (1998). Manajemen Proyek. Jilid 2. Erlangga. Jakarta

Wrihatnolo, R R, Dwidjowojoto, R N. (2007). Manajemen Pemberdayaan. Elek Media Komputindo. Jakarta

Published
2019-07-22
How to Cite
Fitri Nur Kharina, & Kusno Adi Sambowo. (2019). ANALISIS KETERLAMBATAN PROYEK SERTA DAMPAKNYA TERHADAP BIAYA DAN WAKTU PELAKSANAAN PROYEK. Jurnal Infrastruktur , 5(1), 13 - 19. https://doi.org/10.35814/infrastruktur.v5i1.614