PENGARUH PRODUKTIVITAS TENAGA KERJA TERHADAP KINERJA WAKTU PROYEK PADA BANGUNAN BERTINGKAT

  • Indah Prasetiya Rini Universitas Gunadarma
DOI: https://doi.org/10.35814/infrastruktur.v3i2.715
Abstract views: 2650 | pdf downloads: 2871
Keywords: labor productivity, time project performance, regression analysis

Abstract

In construction of each project requires resources in its completion. They are workers, costs, tools, methods, and materials. The process for achieving project purpose, have defined the boundary called triple constraints, are budget allocated, schedule, and quality. From these (triple constraint) in the project, productivity of labors are one of an important thing that give an effect in time project performance. This research is to analyze the effect of labor productivity in time project performance at high rise building, especially in Jabodetabek area. The type of data for this research use primary data, and for data analysis technique use a simple linear regression with SPSs v.24 as a software. The result is labor productivity give the effect significantly in time project performance. In other words, if the labor productivity higher than the time to complete all activities will be shorter, and vice versa.

 

References

Abdul Kadir, M.R., Lee, W.P., Jaafar, M.S., Sapuan, S.M., Ali, A.A.A. (2005). Factors Affecting Construction Labour Productivity for Malaysian Residential Projects. Structural Survey, Vol. 23 Issue: 1, pp.42-54.

Alinaitwe, Henry Mwanaki., Mwakali, Jackson A., Hansson, Bengt. (2007). Factors Affecting The Productivity of Building Craftsmen – Studies of Uganda. Journal of Civil Engineering and Management, Vol. XIII, No. 3: 169 – 176.

Bekr, Ghanim A. (2016). Study of Significant Factors Affecting Labor Productivity at Construction Sites in Jordan: Site Survey. Journal of Engineering Technology (JET), Vol. 4 No. 1, pp. 92 – 97.

Enshassi, Adnan., Mohamed, Sherif., Mustafa, Ziad Abu., Mayer, Peter Eduard. (2007). Factors Affecting Labour Productivity in Building Projects in the Gaza Strip. Journal of Civil Engineering and Management, Vol. XIII, No. 4: 245 – 254.

Ervianto, Wulfram I. (2005). Manajemen Proyek Konstruksi (Edisi Revisi), Andi.

Hanafi, Mohd Hanizun., Khalid, Abd. Ghani., Razak, Arman Abdul., Abdullah, Shardy. (2010). Main Factors Influencing Labour Productivity of the Installation of On-Site Prefabricated Components. International Journal of Academic Research, Vol. 2, No. 6, Part I.

Margareth, Lelly., Simanjuntak, Manlian Ronald A. (2010). Pengaruh Produktivitas Tenaga Kerja Terhadap Kinerja Proyek Bangunan Tinggi di DKI Jakarta. Konferensi Nasional Teknik Sipil 4 (KoNTekS 4).

Muzayanah, Yannu. 2008. Pemodelan Proporsi Sumber Daya Proyek Konstruksi. Tesis Program Pasca Sarjana Universitas Diponegoro. Semarang. 136 hlm.

Riantini, Leni Sagita., Trigunarsyah, Bambang., Abidin, Ismeth., Latief, Yusuf. (2005). Penentuan Peringkat Faktor Risiko dalam Rekrutmen Tenaga Kerja yang Mempengaruhi Biaya Tenaga Kerja pada Proyek. Jurnal Teknik Sipil, Vol. 12 No. 3.

Santoso, Singgih, 2005. Menguasai Statistik di Era Informasi dengan SPSS 12, Elex Media Komputindo, Jakarta.

Soeharto, Iman (1997). Manajemen Proyek: dari Konseptual sampai Operasional. Erlangga.

Soekiman, A., K. S. Pribadi, B. W. Soemardi, R. D. Wirahadikusumah. (2011). Factors Relating to Labor Productivity Affecting the Project Schedule Performance in Indonesia. Procedia Engineering 14 (2011), 865 – 873.

Thomas, Anu V., Sudhakumar, J. (2014). Factor Influencing Construction Labour Productivity: An India Case Study. Journal of Construction in Developing Countries, 19(1), 53-68.

Uyanto, Stanislaus S .(2006). Pedoman Analisis Data dengan SPSS. Graha Ilmu.

Widayat, Wahyu. (2007). Faktor-Faktor Risiko yang Menyebabkan Rendahnya Produktivitas Tenaga Kerja Terampil yang Berpengaruh terhadap Keterlambatan Waktu Proyek. Tesis Program Studi Teknik Sipil Universitas Indonesia. Depok. 108 hlm.

Published
2019-07-29
How to Cite
Indah Prasetiya Rini. (2019). PENGARUH PRODUKTIVITAS TENAGA KERJA TERHADAP KINERJA WAKTU PROYEK PADA BANGUNAN BERTINGKAT. Jurnal Infrastruktur , 3(2), 127-135. https://doi.org/10.35814/infrastruktur.v3i2.715