PERENCANAAN METODE PELAKSANAAN DAN RENCANA ANGGARAN BIAYA REKONSTRUKSI JPO PASAR MINGGU

(Planning Method of Implementation and Budget Plan Cost Reconstruction JPO At Pasar Minggu)

  • Naomi Oktriani Br Damanik PT. Grid Solution Indonesia
  • Kusno Adi Sambowo Universitas Negeri Jakarta
DOI: https://doi.org/10.35814/infrastruktur.v4i1.719
Abstract views: 786 | PDF downloads: 4499
Keywords: Crossing bridge of people, steel frame, method of implementation, cost

Abstract

The crossing bridge at Pasar Minggu is the link between the train station and the shopping center opposite. The reconstruction of the collapsed bridge starts with problem identification and research, then chooses the most appropriate method to use in the reconstruction process, and calculates the cost for the reconstruction of the bridge. From the research results it can be seen that the bridge is reconstructed by retrofitting method where the existing bridge structure is reinforced by the method of scaffolding and launching, so that the bridge is again become feasible to be used, and the cost required to reconstruct the bridge is Rp 1.213.239.230.

References

Asiyanto. (2011). Metode Konstruksi Jembatan Rangka Baja. UI Press, Jakarta.

Anil K. Agrawal and Barney T. Martin Jr. (2017). Review of Inspection, Evaluation and Maintenance of Suspension Bridges, and Inspection, Evaluation and Maintenance of Suspension Bridges: Case Studies edited by Sreenivas Alampalli and William J. Moreau.Journal of Bridge Engineering, Vol.23,Issue4.

Ayu Pangestuti dan Dhian. (2015). Jembatan Struktur Rangka Baja (Steel Truss Bridge) Permodelan Jembatan Rangka “Dam Bridge”. Jakarta : Bridge. Vol.2,No.2.

Badan Standardisasi Nasional., 2005. RSNI T-02-2005 Tata Cara Perhitungan Untuk Jembatan. Jakarta: BSN.

Badan Standardisasi Nasional., 2005. RSNI T-03-2005 Perencanaan Struktur Baja Untuk Jembatan. Jakarta: BSN.

Chen, W.,F. & Duan, L. (1999). Structural Engineering Handbook. USA : CRC Press LLC.

Chen, W.,F. & Duan, L. (2000). Bridge Engineering Handbook. USA : CRC Press LLC.

Chen, W.,F. & Duan, L. (2003). The Civil Engineering Handbook Second Edition. USA : CRC Press LLC.

Direktorat Jenderal Binamarga. (1995). Tata Cara Perencanaan Jembatan Penyeberangan untuk Pejalan kaki di perkotaan, Departemen Pekerjaan Umum.

Departemen Pekerjaan Umum. (1995). Tata Cara Perencanaan Jembatan Penyeberangan Untuk Pejalan Kaki di Perkotaan. Jakarta.

Gunawan, R. (1987). Tabel Profil Konstruksi Baja.Yogyakarta: Penerbit Kanisius.

Hasan Busri. (2014). Analisis Alternatif Desain Bangunan Jembatan dengan Value Engineering.Surabaya: Jurnal Teknik Sipil.Vol.7 No.1, hal. 31-38.

L.T. Transport Ltd. (2004). Footbridges – A manual for Construction at Community and District Level. UK : Department for International Development.

Naiwei Lu and Mohammad Noori,. (2017). Fatigue Reliability Assessment of Welded Steel Bridge Decks under Stochastic Truck Loads via Machine Learning. Journal of Bridge Engineering, Vol.22,Issue 1.

Pedoman Perencanaan Jalur Pejalan Kaki pada Jalan Umum No.032/T/BM/1999, Kementrian Pekerjaan Umum.

Prisyafada, F.X. (2014). Perancangan Jembatan Hybrid Pejalan Kaki Kelas I Dengan Bentang Utama 80 meter. Yogyakarta : Jurusan Teknik Sipil dan Lingkungan.

P.Dey and S.Narasimhan. (2017). Evaluation of Design Guidelines for the Serviceability Assessment of Pedestrian Bridges. Journal of Bridge Engineering, Vol.22,Issue 1.

Rudy Setiawan, ST., MT. (2006). Faktor- faktor yang mempengaruhi pemanfaatan jembatan penyeberangan, simposium IX FSTPT, Universitas Brawijaya, Fakultas Teknik Sipil & Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, Surabaya.

Setiawan, A. (2008). Perencanaan Struktur Baja dengan Metode LRFD. Jakarta : Penerbit Erlangga.

Sukrawa Made. (2004). Buku Ajar Mata Kuliah Teknik Jembatan, Jurusan Teknik Sipil FT UNUD, Denpasar

Supriyadi, B. & Muntohar, A.S. (2007). Jembatan. Yogyakarta : Beta Offset.

Tarigan, A.B., Perancangan Ulang Sambungan Baja Jembatan Gantung Pejalan Kaki Desa Kendalsari-Dompol, Klaten. Yogyakarta : Jurusan Teknik Sipil dan Lingkungan Fakultas Teknik Universitas Gadjah Mada.

United States Army’s, Army Publishing Directorate., 2002. FM 3-34-343. United States Field Army Manuals for Fixed Bridging

Yudhistira, A.T. (2013). Evaluasi Kelayakan dan Fungsi Struktur Atas Jembatan Berdasarkan Nisai Sisa Kapasitas Jembatan. Yogyakarta : Jurusan Teknik Sipil dan Lingkungan Fakultas Teknik Universitas Gadjah Mada.

https://www.ilmutekniksipil.com/struktur-jembatan-2/metode-pelaksanaan-pekerjaan-konstruksi-jembatan ( diakses hari Kamis, 16 November 2017)

https://www.academia.edu/6947166/PEKERJAAN_PERAKITAN_JEMBATAN_RANGKA_BAJA (diakses hari Senin 11 Desember 2017)

Ilham, M Noer. (2011). Jenis Jembatan. http://mnoerilham.blogspot.com/. Diakses pada hari Jumat, 17 November 2017 pukul 20.43)

Published
2019-07-29
How to Cite
Oktriani Br Damanik, N., & Adi Sambowo, K. (2019). PERENCANAAN METODE PELAKSANAAN DAN RENCANA ANGGARAN BIAYA REKONSTRUKSI JPO PASAR MINGGU. Jurnal Infrastruktur , 4(1), 43-51. https://doi.org/10.35814/infrastruktur.v4i1.719