Optimization of Production Scheduling on the Nct Vipross 255 Machine Using the Heuristic Priority Dispatching Rules Method and Overall Equipment Effectiveness
DOI:
https://doi.org/10.35814/mszjbf44Keywords:
Scheduling, NCT Vipross 255, Utility MachinesAbstract
Scheduling is defined as the process of allocating resources or machines – machines for scheduling a set of tasks in a specific time period, then based on the Priority of the job one Dispacthing Rules have a high priority for the further processed on the machine. This research uses a scheduling and Dispatching Rules Such As Oee
The best production scheduling results i.e. use rules Such As the Total value of Flow Time of 1708.61 minutes into 1288.14 minutes, Average Flow Time of 170.86 minutes, Utilitasn minutes, 128.81 became the engine of the menigkat 20% to 26% and the average queue job from 5.06 seconds be 3.81 minutes. The results of the second best production scheduling also uses the rules to all the components of the job SUCH AS the total value of maximum Flow time of the 594.35 minutes be 348.17 seconds, the average completion time maximum 34.96 seconds, becoming 23.7 seconds and the average queue job maximum 7.23 minutes be 5.12 seconds, the result of the calculation of the value of the Avaibility Rate (AR) 5.86%, the value of the performance Rate (PR) 91.34%, Rate Of Quality 97,15, Overal Eqiupment Effektivines (OEE) 83.76%
Downloads
References
[1]. Askin, S, etal, Modeling and Alanalysis of Manufacturing System , New. York, Crichester, Brisbane, Toronto, Singapura. 1993
[2]. Bedworth, D, etal, Integrated Production System, Management Analisi,Desaign 2E, New York Chishester Brisbane Toronto Singapura.1993
[3]. Heizer, J. dan Render, B, Production and Operation MangementStategic and Tactical Decision, edisi 4, Pretice Hall, New Jersey.1995
[4]. Nasotion AH, Managemen Industri, Andi, Yogyakarta.2006
[5]. Solihin, L, Penjadwalan Produksi IC Pada Mesin Molding Jenis MGP Mold di PT Unisem, Fakultas Teknik, Universitas Riau Kepulauan, Batam.2012
[6]. Dyah Ika R.Nadia C, Analisis. Penerapan Total Productive Maintenance (TPM) menggunakan Overal Equivment Effektivines (OEE) dan Six Big Loses pada Mesin Cative.Prosiding SNATIF.2014
[7]. Yusuf B dan Arif R, Rakhmat, Analisa Overal Equipment Effektivines Untuk Memperbaiki Sistem Perawatan Mesin Dop Berbasis Total Productive Maintenance. Teknik Industri Universitas Brawijaya.2015
[8]. Lutfi H dan Retno A, Pengukuran Overall Equipment Effektiviness (OEE) Sebagai Dasar Pengambilan Kebijakan Maintenance.2016
[9]. Fitriani, R dan G.B Kuncoro. Analisa Perbaikan Mesin CNC MA-1 dengan Menggunakan Indikator Kinerja Overall Equipment Effectiveness (OEE). Prosiding SNST Ke -4 Fakultas Teknik Universitas Wahid Hasyim Semarang.2013
[10]. Yuniaristanto,Ifandi I dan Ikwan N, Penjadwalan pekerjaan Dengan Menggunakan Dispatching Rulers ,Gema Teknik.2007
[11]. Baker,K,R, Introduction to Sequencing and Scheduling,John Wiley and Sons ,New York.1974
[12]. Frenc, S, Survey Of Job Shop Scheduling Techniques, Allis Horwood Limited,Chichester.1996
[13]. Agil S,Saprianto H, Pengukuran Nilai Overall Equipment Effectiviness Mesin CNC Cutting , Teknik Industri, Istitut Teknologi sepuluh November.2012
[14]. Ida N,Susanto Y. Analisis Perhitungan Overal Equivment Efektiviness (OEE) Mesin Packing.Fakultas teknik ,Universitas muhammadiyah Surakarta.2014
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Teknobiz : Jurnal Ilmiah Program Studi Magister Teknik Mesin

This work is licensed under a Creative Commons Attribution 4.0 International License.