Forecasting Methods Proposal and Implementation of Distribution Requirement Planning Method to Overcome Unfulfilled Stock Availability at PT. XYZ

  • Christine Natalia Yuan Ze University & Atma Jaya Catholic University of Indonesia
  • Sebastian Gunawan Chung Yuan Christian University
  • Yun Chia Liang Yuan Ze University
  • Andre Sugioko Atma Jaya Catholic University of Indonesia
  • Wawan Tripiawan Chung Yuan Christian University & Telkom University
  • Marcelinus Fredikson Atma Jaya Catholic University of Indonesia
DOI: https://doi.org/10.35814/asiimetrik.v7i1.7314
Abstract views: 31 | PDF downloads: 17
Keywords: DRP, forecasting, production planning, inventory control, time series

Abstract

PT. XYZ is a manufacturing company engaged in the automotive sector by producing various automotive components. Based on the results of observations and interviews at PT. XYZ, it is known that there is a shortage of stock, so that customer or consumer requests are not fulfilled at each existing distribution center (DC). Based on the problems that occur, the research result suggestions for the best forecasting method based on the time series plot of each DC request processing using the Distribution Requirement Planning (DRP) method. In addition, with the DRP method, there is additional stock. The company still has remaining stock so it can still meet customer demand for each DC, and the product distribution process runs more regularly if any defective product should be replaced. Based on research results, the DRP method is able to minimize the risk of unfulfilled demand due to product defects.

Downloads

Download data is not yet available.

References

Ardian, D. et al. (2021) ‘Production Planning in a Rack Industry Using Moving Average Forecasting Method and Material Requirements Planning’, in Proceedings of the International Conference on Industrial Engineering and Operations Management. 1st Indian International Conference on Industrial Engineering and Operations Management, Bangalore, India: IEOM Society International, pp. 280–290. Available at: https://doi.org/10.46254/IN01.20210077.

Bowersox, D.J. et al. (2023) Supply Chain Logistics Management. 6th edn. McGraw Hill. [Print]

Erraoui, Y., Charkaoui, A. and Echchatbi, A. (2019) ‘Demand Driven DRP: Assessment of a New Approach to Distribution’, International Journal of Supply and Operations Management, 6(1), pp. 1–10. Available at: https://doi.org/10.22034/2019.1.1.

Guslan, D. and Indah, G.H.N. (2022) ‘Perencanaan Distribusi Semen Bag dengan Distribution Requirement Planning (DRP) PT Semen Padang’, Jurnal Logistik Bisnis, 12(1), pp. 17–30.

Hanafie, A., Syarifuddin, R. and D, A. (2020) ‘Penjadwalan Distribusi dengan Menggunakan Metode Distribution Resources Planning (DRP)(Studi Kasus PT. Biota Laut Ganggang)’, Journal Industrial Engineering and Management (JUST-ME), 1(2), pp. 31–36. Available at: https://doi.org/doi.org/10.47398/justme.v1i02.7.

Huriati, P. et al. (2022) ‘Implementation of The Moving Average Method for Forecasting Inventory in CV. Tre Jaya Perkasa’, International Journal of Advanced Science Computing and Engineering, 4(2), pp. 67–75. Available at: https://doi.org/10.62527/ijasce.4.2.77.

Kurniawan, M.H. and Herwanto, D. (2022) ‘Penerapan Metode Double Exponential Smoothing dan Moving Average pada Peramalan Permintaan Produk Gasket Cap di PT. Nesinak Industries’, Jurnal Serambi Engineering, 7(1), pp. 2537–2546. Available at: https://doi.org/10.32672/jse.v7i1.3709.

Magdalena, R. and Suli, T. (2019) ‘Forecasting Methods and Implementation of DRP (Distribution Requirement Planning) Methods in Determining the Master Production Schedule’, in IOP Conference Series: Materials Science and Engineering. 11th ISIEM (International Seminar on Industrial Engineering & Management), Makasar, South Sulawesi, Indonesia: IOP Publishing, p. 012049. Available at: https://doi.org/10.1088/1757-899X/528/1/012049.

Mansur, N.K., Bukhori, S. and Juwita, O. (2019) ‘Sistem Informasi Distribusi Cabai Dengan Metode Distribution Requirements Planning (DRP) di Provinsi Jawa Timur’, INFORMAL - Informatics Journal, 4(1), pp. 19–24.

Mbuli, N. et al. (2020) ‘Decomposition Forecasting Methods: A Review Of Applications In Power Systems’, Energy Reports, 6, pp. 298–306. Available at: https://doi.org/10.1016/j.egyr.2020.11.238.

Mukhsin, M. and Sobirin, M.T. (2022) ‘Scheduling Process Analysis Distribution of Product Using the Distribution Requirement Planning (DRP) Method’, AFEBI Management and Business Review, 7(2), pp. 78–89.

Muttaqin, M.B., Martini, S. and Aurachman, R. (2017) ‘Perancangan Dan Penjadwalan Aktivitas Distribusi Household Product Menggunakan Metode Distribusi Requirement Planning (DRP) Di PT. XYZ Untuk Menyelaraskan Pengiriman Produk Ke Ritel’, JRSI (Jurnal Rekayasa Sistem dan Industri), 4(01), pp. 56–61. Available at: https://doi.org/10.25124/jrsi.v4i01.210.

Ngatilah, Y. et al. (2020) ‘Inventory Control System Using Distribution Requirement Planning (DRP) (Case Study : Food Company)’, in Journal of Physics: Conference Series. International Conference on Science and Technology 2019, Surabaya, Indonesia: IOP Publishing, p. 032005. Available at: https://doi.org/10.1088/1742-6596/1569/3/032005.

Omar, M.A., Shahin, Sara.E. and Roshdy, M. (2022) ‘Forecasting Inflation in Egypt (2019-2022) by using AutoRegressive Integrated Moving Average (ARIMA) Models’, Journal of Advanced Veterinary Research, 12(6), pp. 670–676.

Pujawan, I.N. and Mahendrawathi (2024) Supply Chain Management. 4th edn. Indonesia: Penerbit Andi. [Print].

Supriyadi, S. and Riskiyadi, R. (2016) ‘Penjadwalan Produksi IKS-Filler Pada Proses Ground Calcium Carbonate Menggunakan Metode MPS Di Perusahaan Kertas’, SINERGI, 20(2), pp. 157–164. Available at: https://doi.org/10.22441/sinergi.2016.2.010.

Surya, R.S. (2013) ‘Implementasi Metode Distribution Requirements Planning (DRP) pada CV. Karya Mandiri Sejahtera di Surabaya’, CALYPTRA, 2(1), pp. 1–19.

Wahyuningsih, D., Pradana, H.A. and Hamidah (2018) ‘Prediction of The Needs of Industrial Oil Fuels with The Implementation of Distribution Requirement Planning (DRP)’, in 2018 3rd International Conference on Information Technology, Information System and Electrical Engineering (ICITISEE). 3rd International Conference on Information Technology, Information System and Electrical Engineering (ICITISEE), Yogyakarta, Indonesia: IEEE, pp. 304–307. Available at: https://doi.org/10.1109/ICITISEE.2018.8721002.

Widodo, D.S. (2018) ‘Perbandingan Model Lot Sizing Berbasis Material Requirement Planning Untuk Mengoptimalkan Biaya Persedian’, Heuristic, 15(02), pp. 1–10. Available at: https://doi.org/doi.org/10.30996/he.v15i02.2138.

Yuliana, P.E. and Rahayu, S. (2019) ‘Analisis Pengaruh Penerapan Metode DRP Terhadap Bullwhip Effect Pada Rantai Suplai’, Journal of Information System,Graphics, Hospitality and Technology, 1(02), pp. 42–46. Available at: https://doi.org/10.37823/insight.v1i02.46.

Published
2025-01-31
How to Cite
Natalia, C., Gunawan, S., Liang, Y. C., Sugioko, A., Tripiawan, W. and Fredikson, M. (2025) “Forecasting Methods Proposal and Implementation of Distribution Requirement Planning Method to Overcome Unfulfilled Stock Availability at PT. XYZ”, Jurnal Asiimetrik: Jurnal Ilmiah Rekayasa & Inovasi, 7(1), pp. 21-28. doi: 10.35814/asiimetrik.v7i1.7314.
Section
Articles