Electrical Performance Test Design for Speed Sensor Torque Flow, Rear Brake, and Solenoid ECMV Power Train  HD785-7 at PT XYZ

Authors

  • Setia Abikusna Politeknik Astra
  • Diki Ramadhani Politeknik Astra
  • Leo Setiawan Politeknik Astra
  • Lukyawan Pama Deprian Politeknik Astra
  • Randy Putra Afani Politeknik Astra

DOI:

https://doi.org/10.35814/asiimetrik.v7i2.8613

Keywords:

electrical performance test, solenoid ECMV, speed sensor, power train

Abstract

PT XYZ's Component Exchange (COMEX) Department has 8 Quality Assurance Processes, one of which is performance test (QA6). The performance test is conducted to evaluate the condition of overhauled components. From January to February 2024, the COMEX Department experienced issues with electrical components in the Power Train area, specifically the Electronic Control Modulating Valve (ECMV) solenoid, torque flow speed sensor, and rear brake speed sensor. Currently, the functional inspection tool for the solenoid only uses an Arduino as a power supply and an impact wrench as a substitute for the gear shaft to inspect the torque flow speed sensor and rear brake speed sensor. The results from these inspections are inaccurate, leading to rework on the transmission components and the brake final drive of the HD785-7. The 8-step method was used to address these issues. This method includes Determining Themes, Current Condition Analysis, Target Setting, Root Cause Analysis, Improvement Plan, Improvement Implementation, Result Evaluation, Standardization and Improvement Plan. Improvements included creating an electrical performance test tool, developing work instructions for using the tool, and establishing a reusable parts standard. The tool successfully reduced the rework of electrical parts, achieving a 100% reduction in rework from January-February 2024 to April-June 2024.

Downloads

Download data is not yet available.

References

Arfan, M.M., Sugengriadi, R.M. and Ropik, A. (2023) ‘Implementasi Konsep Kaizen Untuk Meningkatkan Output Produksi Line Reconditions di Bagian Produksi PT. XYZ dengan Metode Siklus PDCA (Plan-Do-Check-Action)’, INFOTEX: Jurnal Ilmiah Bidang Ilmu Teknik, 2(1), pp. 87–101.

Darmawan, H., Hasibuan, S. and Purba, H.H. (2018) ‘Application of Kaizen Concept with 8 Steps PDCA to Reduce in Line Defect at Pasting Process: A Case Study in Automotive Battery’, International Journal of Advances in Scientific Research and Engineering (IJASRE), 4(8), pp. 97–107. Available at: https://doi.org/10.31695/IJASRE.2018.32800.

Dartawan, D. and Setiafindari, W. (2023) ‘Analisis Pengendalian Kualitas Produk Dengan Metode Seven Tools Dan Kaizen Pada PT Sinar Semesta’, Jurnal ARTI: Aplikasi Rancangan Teknik Industri, 18(1), pp. 29–38. Available at: https://doi.org/10.52072/arti.v18i1.517.

Debora, F., Prasetyo, M.A. and Rosma, R. (2021) ‘Peningkatan Produktivitas Part X Pada Mesin Bending LR 221 Dengan Metode Pdca (Plan, Do, Check, Action)’, Jurnal Inkofar, 5(1), pp. 41–49. Available at: https://doi.org/10.46846/jurnalinkofar.v5i1.187.

Devani, V. and Oktaviany, M. (2021) ‘Usulan Peningkatan Kualitas Pulp Dengan Menggunakan Metode Seven Tools Dan New Seven Tools di PT. IK’, Agrointek : Jurnal Teknologi Industri Pertanian, 15(2), pp. 521–536. Available at: https://doi.org/10.21107/agrointek.v15i2.7166.

Erdhianto, Y. (2021) ‘Quality Control Analysis to Reduce the Number of Defects in the Packaging of PG Kremboong Sugar Products Using Seven Tools Method’, TiBuana: Journal of applied Industrial Engineering, 4(1), pp. 28–35. Available at: https://doi.org/10.36456/tibuana.4.01.3174.28-35.

Fernando, V. et al. (2022) ‘Analysis Capability Process of Fuel Tank Production: A Case Study in Manufacturing Industry’, JKIE (Journal Knowledge Industrial Engineering), 9(1), pp. 24–34. Available at: https://doi.org/10.35891/jkie.v9i1.2919.

Hardono, J., Pratama, H. and Friyatna, A. (2019) ‘Analisis Cacat Produk Green Tyre dengan Pendekatan Seven Tools’, Jurnal INTECH Teknik Industri Universitas Serang Raya, 5(1), pp. 1–6. Available at: https://doi.org/10.30656/intech.v5i1.1462.

Hendra, H. et al. (2021) ‘Evaluation of Product Quality Improvement Against Waste in the Electronic Musical Instrument Industry’, Jurnal Ilmiah Teknik Elektro Komputer dan Informatika, 7(3), pp. 402–411. Available at: https://doi.org/10.26555/jiteki.v7i3.21904.

Hernadewita, H. et al. (2019) ‘Implementation of the quality control circle for improvement of painting production in PT QWE’, Journal of Applied Research on Industrial Engineering, 6(1), pp. 16–25. Available at: https://doi.org/10.22105/jarie.2019.169238.1074.

Inayah, S.K., Wahyudin, W. and Herwanto, D. (2023) ‘Analisis Kualitas Produk Toolbox Menggunakan Metode Seven Tools di PT. KSKB: Product Quality Analysis of Toolbox using Seven Tools Method at PT. KSKB’, Jurnal Asiimetrik: Jurnal Ilmiah Rekayasa & Inovasi, 5(2), pp. 263–272. Available at: https://doi.org/10.35814/asiimetrik.v5i2.4877.

Khamaludin, K.K. and Respati, A.P. (2019) ‘Implementasi Metode QCC untuk Menurunkan Jumlah Sisa Sampel Pengujian Compound’, Jurnal Optimasi Sistem Industri, 18(2), pp. 176–185. Available at: https://doi.org/10.25077/josi.v18.n2.p176-185.2019.

Rochman, Y. and Agustin, A. (2017) ‘Minimization of Defective Products in The Department of Press Bridge & Rib Through Six Sigma DMAIC Phases’, in IOP Conference Series: Materials Science and Engineering. 5th International Conference on Manufacturing, Optimization, Industrial and Material Engineering, Bali, Indonesia: IOP Publishing Ltd, p. 012035. Available at: https://doi.org/10.1088/1757-899X/215/1/012035.

Rosyidi, E. et al. (2014) Kaizen SMK: Membangun Karakter Problem Solving. 2nd edn. Jakarta, Indonesia: LP2M Politeknik Manufaktur Astra. [Print].

Setiawan, I., Perdana, B.C. and Aisa, N.N. (2024) ‘Optimisation of the Partial Runner Set-up Process in Plastic Injection Moulds Using Eight Steps in the Motorcycle Industry’, Quality Innovation Prosperity, 28(1), pp. 223–240. Available at: https://doi.org/10.12776/qip.v28i1.1980.

Setiawan, L. et al. (2024) ‘Rancang Bangun Sistem Pemantauan Data Pengujian Performa Transmisi Komatsu HD785-7 Pada Mesin Maruma MH-125D Berbasis Microcontroller’, Jurnal Inovasi Teknik Industri, 3(1), pp. 41–51. Available at: https://doi.org/10.26753/jitin.v3i1.1368.

Setiobudi, E. (2017) ‘Analisis Sistem Penilaian Kinerja Karyawan Studi pada PT. Tridharma Kencana’, JABE (Journal of Applied Business and Economic), 3(3), pp. 170–182. Available at: https://doi.org/10.30998/jabe.v3i3.1768.

Sulaeman, G.M.R. and Gusniar, I.N. (2023) ‘Analisis Pengendalian Kualitas Menggunakan Metode Quality Control Circle pada Part JK6000 di PT. XYZ’, Jurnal Serambi Engineering, 8(2), pp. 5029–5036. Available at: https://doi.org/10.32672/jse.v8i2.5665.

Suparno, S. and Susanto, A.S. (2021) ‘Peningkatan Produktivitas Leaf Spring Jenis Minicup Tipe MMS 2230 dengan Mengurangi Pemborosan Proses Produksi Melalui Penerapan Metode Lean Manufacturing’, Jurnal Rekayasa Sistem Industri, 10(1), pp. 89–100. Available at: https://doi.org/10.26593/jrsi.v10i1.3813.89-100.

Suratno and Ichtiarto, B.P. (2021) ‘Reduce Carbon Emissions of Logistic Transportation Using Eight Steps Approach in Indonesian Automotive Industry’, Journal Européen des Systèmes Automatisés, 54(6), pp. 819–826. Available at: https://doi.org/10.18280/jesa.540603.

Utama, A.Y., Supriyatna, H. and Kusuma, R.D.P. (2020) ‘Quality Control Analysis Of Candy Wrapping Process Using The Qcc Quality Control Circle Method In The Candy Industry Indonesian’, International Journal of Innovative Science and Research Technology (IJISRT), 5(1), pp. 297–309.

Implementation of electrical circuit

Downloads

Published

2025-07-31

Issue

Section

Articles

How to Cite

“Electrical Performance Test Design for Speed Sensor Torque Flow, Rear Brake, and Solenoid ECMV Power Train  HD785-7 at PT XYZ” (2025) Jurnal Asiimetrik: Jurnal Ilmiah Rekayasa & Inovasi, 7(2), pp. 173–182. doi:10.35814/asiimetrik.v7i2.8613.